Skip to main content

Work

OKR Examples and Template

An OKR is one qualitative objective and three to five key results with a baseline and a target. Most examples stop at the first day of the quarter. These five go further: weekly check-ins, a personal OKR, and a quarter scored honestly at the end. The template keeps all of it in one note.

Updated 2026-10-27

Copy and adapt

The template

OKRsTemplate

OKRs, [team or name], [Q1 2027]

Owner: [name]. Period: [YYYY-MM-DD] to [YYYY-MM-DD] Related: [[Company OKRs Q1 2027]]

Objective 1: [qualitative, ambitious, one sentence]

Why now: [what happens if we do nothing this quarter] Type: [committed: we expect 1.0 / aspirational: 0.6 to 0.7 is a good result]

Key resultBaselineTargetCurrentConfidence
KR1: [metric][x][y][x][0 to 10]
KR2: [metric]
KR3: [metric]

Initiatives (the work we bet will move the KRs):

  • [Project or experiment] (@[owner]) @due(YYYY-MM-DD)

Objective 2: [...]

...

Weekly check-in

[YYYY-MM-DD]

  • Moved: [KR, from, to]
  • Confidence changed: [KR, from, to, and why]
  • Blocked on: [what, and who can unblock it]

End-of-quarter score

Key resultFinalScore
KR1[0.0 to 1.0]
  • Objective score: [average of the KR scores]
  • What we learned: [...]
  • Next quarter: [carry / change / drop], because [reason]

5 examples

Examples for different situations

The same structure, filled in for the situations people actually bring to it. Copy the one closest to yours.

1.Engineering team: reliability OKR

When it fits: Use this when an engineering team has to protect reliability work from a roadmap that keeps adding features, and the OKR is the written agreement.

Engineering team: reliability OKRExample 1

OKRs, Payments platform team, Q1 2027

Owner: Ines Carvalho. Period: 2027-01-04 to 2027-03-31 Related: [[Company OKRs Q1 2027]]

Objective: Make checkout something on-call stops dreading

Why now: Seven Sev-2 incidents in November, all in checkout. Two senior engineers have asked to leave the on-call rota. Type: committed

Key resultBaselineTargetCurrentConfidence
KR1: p95 checkout latency1.8 s0.9 s1.8 s6
KR2: Sev-2 incidents per month in checkout7275
KR3: On-call pages per week145147

Initiatives:

  • Move tax calculation off the request path (@Bruno) @due(2027-02-12)
  • Retire the legacy payment adapter (@Ines) @due(2027-03-05)
  • Delete or fix the 11 alerts that paged in December with no action taken (@Kai) @due(2027-01-22)

Agreed with product: the new wallet payment method moves to Q2. Design work only this quarter.

Weekly check-in

2027-02-08

  • Moved: KR3 from 14 to 8 pages a week after the alert cleanup. KR1 from 1.8 s to 1.5 s.
  • Confidence changed: KR2 from 5 to 4. One Sev-2 in January came from the card processor, not our code; we cannot fix that this quarter.
  • Blocked on: Bruno is pulled into the wallet design review twice a week. Raising with Dana on Wednesday.

2.Customer success: activation OKR

When it fits: Use this when a team owns a number that sales, product and support all touch, and the OKR has to say which part of it this team will move.

Customer success: activation OKRExample 2

OKRs, Customer success, Q1 2027

Owner: Dev Malhotra. Period: 2027-01-01 to 2027-03-31 Related: [[Company OKRs Q1 2027]], [[Onboarding]]

Objective: New accounts get real value in their first 30 days

Why now: 9% of new accounts cancel in the first 90 days, and exit surveys say "never got set up" more than "too expensive". Type: aspirational

Key resultBaselineTargetCurrentConfidence
KR1: 30-day activation (3+ projects and 2+ teammates invited)41%60%41%5
KR2: Median days to first project6266
KR3: Cancellations in first 90 days9%6%9%4

Initiatives:

  • Replace the 40-minute kickoff call with a 15-minute setup call for accounts under 20 seats (@Grace) @due(2027-01-29)
  • Three project templates preloaded for the top three industries (@Omar) @due(2027-02-19)
  • Day-3 and day-10 check-in emails from a named person (@Dev) @due(2027-01-15)

Weekly check-in

2027-01-25

  • Moved: KR2 from 6 to 4 days for accounts that got the short setup call.
  • Tension: sales promised custom onboarding to two enterprise accounts. Agreed with Priya (sales): enterprise accounts are out of scope for these KRs and tracked separately, so the numbers stay comparable.
  • Confidence changed: KR3 stays at 4. Cancellations lag by 90 days; we will not see most of the effect until Q2.

3.Public library branch: outreach OKR

When it fits: Use this when you are outside the tech world, the team is small and part-time, and you need OKRs that measure people showing up rather than revenue.

Public library branch: outreach OKRExample 3

OKRs, Eastside branch library, Q1 2027

Owner: Gabriela Ruiz (youth services). Period: 2027-01-04 to 2027-03-31 Related: [[Branch plan 2027]]

Objective: Eastside is where neighborhood teens choose to spend after school

Why now: The rec center two blocks away closed in October. Teens are on the street or at the bus station from 3 to 6. Type: aspirational

Key resultBaselineTargetCurrentConfidence
KR1: Average teen visits, weekdays 3 to 6 pm (desk tally)2240225
KR2: Programs designed and run by the teen advisory group0307
KR3: New library cards, ages 13 to 18015006

Initiatives:

  • Recruit 6 teens for an advisory group, $15 gift card per meeting from the Friends of the Library fund (@Gabriela) @due(2027-01-22)
  • Card sign-up table at Eastside High lunch periods, two days (@Gabriela, @Tom) @due(2027-02-05)
  • Move the study room booking limit from 1 to 2 hours for teens after 3 pm (@branch manager) @due(2027-01-15)

Constraint: Gabriela is 18 hours a week. Tom (security) is worried about noise near the quiet reading area; teen programs go in the community room only.

Weekly check-in

2027-02-15

  • Moved: KR1 from 22 to 31. KR3 at 88 cards after the two school tables.
  • First teen-run program (a Friday open-mic) is booked for Feb 26.

4.Personal OKR for a big physical goal

When it fits: Use this when the goal is personal, has a fixed date, and needs two objectives (the goal and the money or time it depends on) tracked together.

Personal OKR for a big physical goalExample 4

OKRs, Sam Whitaker, Feb to Apr 2027

Owner: me. Period: 2027-02-01 to 2027-04-30 Related: [[Rim to rim, May 2027]]

Objective 1: Be strong enough to hike rim to rim in one day and enjoy the last five miles

Type: committed (the trip is booked for 2027-05-14)

Key resultBaselineTargetCurrentConfidence
KR1: Longest training hike6 mi, 1,200 ft gain16 mi, 4,500 ft gain9 mi, 2,100 ft7
KR2: Stair climb with a 20 lb pack, floors in 60 min2570416
KR3: Weeks with 3+ training sessions0 of 1312 of 133 of 38

Objective 2: Go on the trip with no credit card debt

Type: committed

Key resultBaselineTargetCurrentConfidence
KR1: Credit card balance$3,200$0$2,3507
KR2: Trip fund (gear, gas, lodge)$300$1,500$6406

Initiatives:

  • Saturday long hikes, adding 1 to 2 miles a week (@me)
  • Sell the old road bike, put it all on the card (@me) @due(2027-02-28)

Weekly check-in

2027-02-21

  • Moved: longest hike 9 miles. Stairs 41 floors, up from 25.
  • Honest note: knee was sore after the 9-mile descent. Booked a physical therapy check for Mar 2 instead of adding miles next week.
  • Money: bike sold for $480, all on the card.

5.End of quarter: scoring an OKR honestly

When it fits: Use this when the quarter is over, the team half-hit its numbers, and the scoring has to produce a decision for next quarter rather than a grade.

End of quarter: scoring an OKR honestlyExample 5

OKRs, Growth marketing, Q3 2026 (scored 2026-10-02)

Owner: Leah Kim. Period: 2026-07-01 to 2026-09-30 Related: [[Company OKRs Q3 2026]]

Objective: Make organic search a channel we can count on

Type: aspirational

Key resultBaselineTargetFinalScore
KR1: Organic signups per month1203001920.4
KR2: New pages in the top 10 for their main keyword020160.8
KR3: Articles published024241.0

Score per KR = (final minus baseline) divided by (target minus baseline).

  • Objective score: 0.73. Just above the 0.6 to 0.7 range we expect for an aspirational OKR, but the average flatters us.
  • What we learned: KR3 is an output, not a result. We hit it fully and it told us nothing. The KR that matters, signups, is at 0.4. The 16 ranking pages bring traffic but the pages have no clear next step to sign up.
  • Next quarter: change. Keep the objective. Drop KR3. Replace it with "signup rate from organic visits, 0.8% to 1.5%". Carry KR1 with the same 300 target.
  • Who needs to know: Amir (product) for the signup prompt on article pages. Shared in the Oct 6 planning meeting.

What an OKR is

An OKR has two parts. The objective is qualitative and a little uncomfortable: what you want to be true by the end of the quarter, in plain words. The key results are the three to five numbers that will tell you whether it happened, each with a baseline and a target.

A useful test for any OKR: if every key result hits its target, is the objective obviously achieved? If not, a key result is missing or set too low.

Objectives, key results and initiatives

The most common mistake when writing OKRs is mixing these three up.

  • Objective: "Make checkout something on-call stops dreading."
  • Key result: "On-call pages per week from 14 to 5." A result you can measure, not an activity.
  • Initiative: "Delete the 11 alerts that paged with no action taken." The work you bet will move the key result.

Keep initiatives in their own list under the objective. If an initiative is done and the key result did not move, that is the most useful thing the quarter can teach you, and you only see it if the two are separate.

How many OKRs

One to three objectives per team per quarter, three to five key results each. Fewer is better. The point of OKRs is to say what matters most this quarter, and a list of eight objectives says everything matters.

Committed and aspirational OKRs

Label each objective. Committed OKRs are promises: the team expects to hit 1.0 and will move other work to get there. Aspirational OKRs are stretch goals: reaching 0.6 to 0.7 is a good result, and hitting 1.0 every quarter means the targets are too safe. Without the label, a stretch goal at 0.7 reads as failure to anyone outside the team.

The weekly check-in

Most OKRs are written in the first week and read again in the last. In between, nothing connects the numbers to the work. A ten-minute weekly check-in fixes that. Write three lines under the OKR note:

  • Moved: which key results changed, from what to what.
  • Confidence: which estimates went up or down, and why.
  • Blocked: what is in the way, and who can unblock it.

Confidence moves before numbers do. In the first example, the reliability team's confidence on Sev-2 incidents dropped in week six because one incident came from a vendor. That is a conversation to have in February, not a surprise to explain in April.

Closing out the quarter

Score each key result from 0.0 to 1.0 as the share of the distance from baseline to target that you covered. Then write the part that usually gets skipped: what you learned and what happens next. For each objective, decide one of three things.

  1. Carry it to next quarter with the same key results.
  2. Change the key results, usually because one measured activity instead of outcome.
  3. Drop it, and say why, so it is not quietly revived in two quarters.

OKRs vs KPIs

KPIs are the gauges on the dashboard: numbers you watch continuously to know the business is healthy. OKRs are the change you are trying to make this quarter. A KPI often becomes the metric in a key result when you decide it needs to move. When it reaches the target, it goes back to being a KPI you watch.

Personal OKRs

Personal OKRs work when a goal has a date and depends on more than one thing. The hiking example has two objectives (fitness and money) because the trip needs both. Keep it light: no confidence scores if they feel like overhead, a check-in on Sunday, and a score at the end. For a single goal, a SMART goal is simpler. For goals across a whole year, start with the goal setting template.

Customization tips

  • Write key results as outcomes, not tasks

    "Publish 24 articles" is something you do. "Organic signups from 120 to 300 a month" is what you want to happen. Put the doing under Initiatives. The scored quarter above shows what happens when an output sneaks into the KRs: it scores 1.0 and teaches nothing.

  • Always write the baseline

    A key result without a starting number cannot be scored. If you do not know the baseline, the first initiative is measuring it, and the KR target gets set in week two.

  • Label each objective committed or aspirational

    Committed means the team expects to hit 1.0 and will reshuffle work to do it. Aspirational means 0.6 to 0.7 is a good result. Mixing them without labels is how teams end up blamed for missing a stretch goal.

  • Keep confidence next to the number

    A 0 to 10 confidence score per KR, updated weekly, shows trouble before the number does. A KR that sits at the baseline with confidence dropping from 7 to 4 needs a conversation now, not at the end of the quarter.

  • One note per quarter, check-ins inside it

    Add each weekly check-in under the same note rather than starting new ones. At the end of the quarter, the scoring is a matter of reading down the page.

  • For personal OKRs, drop the ceremony

    One or two objectives, two or three key results each, a check-in on Sunday. Skip confidence scores if they feel like overhead. Keep the baseline and the date.

In the app

How to do this in Scribelet

  1. Open Desk Settings, then Templates, tap Add Template, paste the OKR template above and set the category to Planning. Add #okr as a default tag so every quarter's note is easy to find.

  2. Write initiatives as - [ ] Retire the legacy adapter (@Ines) @due(2027-03-05). They appear in the Tasks view and on your daily note until done, so the work stays visible next to the results it is meant to move.

  3. Add - [ ] OKR check-in @remind(2027-02-08 09:30) for each Monday and Scribelet sends a push reminder in your local time.

  4. Link each team's OKR note to [[Company OKRs Q1 2027]]. The company note's backlinks panel then lists every team OKR that claims to support it.

  5. At scoring time, ask the AI chat "what blocked KR2 in the January and February check-ins?" It answers from your check-in notes with citations, which makes the what-we-learned line honest.

Templates, template variables and AI generation are documented in Note templates.

Frequently asked questions

What are OKR goals?

OKR stands for objectives and key results. The objective is a qualitative, ambitious statement of what you want to achieve this quarter. The key results are three to five measurable outcomes, each with a baseline and target, that tell you whether you got there. A common way to write it: I will [objective] as measured by [key results].

Can you give me some examples of objectives?

"Make checkout something on-call stops dreading." "New accounts get real value in their first 30 days." "Eastside is where neighborhood teens choose to spend after school." Good objectives are short, qualitative and say why someone should care. The numbers belong in the key results.

What is better, OKR or KPI?

They do different jobs. A KPI is a number you watch all the time to see if the business is healthy, like uptime or monthly revenue. An OKR is a goal to change something this quarter, and a KPI is often the metric inside a key result. Use KPIs to monitor and OKRs to choose what to improve.

How many OKRs should a team have?

One to three objectives per quarter, each with three to five key results. More than that and the team cannot tell which work matters most, so everything gets a little progress and nothing moves.

How do you score OKRs?

Score each key result from 0.0 to 1.0 as the share of the distance from baseline to target that you covered, then average them for the objective. For aspirational OKRs, 0.6 to 0.7 is a good result; scoring 1.0 every quarter usually means the targets are too safe. The fifth example above shows a full scoring.

Can I use OKRs for personal goals?

Yes, with less ceremony: one or two objectives, a few key results, a Sunday check-in. Personal OKRs work best when the goal has a date and depends on more than one thing, like the hiking example above. For a single goal, a SMART goal is often enough.

OKRs that are still read in week eight

Keep each quarter's OKRs in one Scribelet note with weekly check-ins underneath, track initiatives as tasks with due dates, and score the quarter from what you actually wrote down. Encrypted, free to start.

Free plan, no credit card. See pricing

Planning

SMART Goals Examples

A SMART goal is specific, measurable, achievable, relevant and time-bound. The quickest way to write one is to see a vague goal rewritten next to it. Below are five, for very different lives, each with the baseline, checkpoints and a plan for when it slips. The worksheet walks you through your own.

Planning

Goal Setting Template

Most goal templates are a page you fill in once in January. This one is a chain: a few life goals, three for the year, one milestone each per quarter, and three weekly goals that move them. Copy it whole, or use only the level you need today.

Product

Product Roadmap Template

A roadmap is a promise about priorities, not a schedule. This template ties every initiative to a goal, says how confident you are in each date, keeps a visible list of what you are not doing, and logs every change with its reason. Copy it as-is, or start from the roadmap example closest to your audience.

Product

Sprint Planning Template

Sprint planning goes wrong in two places: the team commits to last sprint's velocity with this sprint's people, and unfinished work rolls over without anyone deciding it should. This template does the capacity math in the open, makes a decision on every carried-over item, and ends with a sprint goal someone could check on demo day.

Projects

Project Status Report Template

A status report tells readers in thirty seconds whether the project is on track, what changed since last time, and what you need from them. This template defines green, amber and red up front, so the color means the same thing every week.

Planning

Weekly Review Template

A weekly review is 45 minutes that stops small things from going stale: clear the inboxes, look back honestly, check every project has a next step, then choose three priorities for next week. Copy the template, or start from the weekly review example closest to your week.